Monday, October 31, 2016

150929b_stores MCB fixing

Fixing continues ....store one ...distribution(MCB) board was fixed....
Also outside fixing with ceiling rose was done...

Tuesday, October 25, 2016

150929b_accessories fixing

Work started today with fixing of Electrical accessories... That's the light and socket switches...

Saturday, October 22, 2016

150929_ accessories purchase

Electrical accessories ; sockets, lamp holders and everything needed for 150929b project purchased to site.

Wednesday, October 19, 2016

150929b_installation test with sensor lamp

Wiring installation still ongoing....
The hall and kitchen has been done with...The trunking part were covered....
The sensor led lamp was temporarily fixed....
and system half way tested....

Tuesday, October 18, 2016

Friday, October 14, 2016

Thursday, October 13, 2016

begin work for trunking

After window painting...
The trunking works for the electrical wiring ..
Began...
Trunking work still in progress...

Saturday, October 8, 2016

solar panel fixing and testing

Today ....
Solar panels installation work is done ....and tested....with lamp and pump....
Actual wiring ...continues on Monday(161009)

panel fixing

Today ....
Solar panels installation work is done ....and tested....with lamp and pump....
Actual wiring ...continues on Monday(161009)

Friday, October 7, 2016

automation and fountain completed_160916

Today.....the 5th day ....
16th of Oct. 2016
Work after all is done and completed....
The automation and fountain work ....

Wednesday, October 5, 2016

automation installation

Work for the high level tanks(4 polytanks) ,that is the automatic switch control was done successfully left with low level(2 polytanks)...

fountain works

Today fountain work was critically diagnosed and improvised a way to solve for all to work....
* The frog design of the fountain was chiseled out and found that the pumps were broken...
* All cables feeding the fountain were broken and couldn't work...
* A new piping system is now being designed to make found operate again...

Monday, October 3, 2016

material purchase

Today .....
I went to purchase materials for Okubi water automation system.....
Sulley and David started with the fountain works ...
The old pump system was troubleshooted and was bent ....so a new pump was fixed and tested running....
And also the cable for the automation water system was drawn....
Work to be continued on 161004......

180124..it_gh Mampong

Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...