Friday, October 9, 2015

oct. 9, 2015

filling in of contract dates, dates of work start and completion in the tasks list.
start :12 pm
stop: 3:30pm

Wednesday, October 7, 2015

Tuesday oct. 6, 2015

I went back to the site and the estimator for the electric house  from electricity company came on Tuesday for site inspection...but he requested for the site plan for the land of the project in order to determine where the pole should be for connection of the electric energy meter. if that isn't provided then I have to provide that before he progresses to give estimate everything...
the estimator rescheduled for next week to provide the site-plan then he can proceed to estimate.
the mason continues with plastering........

Estimate for the waterstation and pillars for the polytank was also made...

Monday oct. 5, 2015

I returned to Kyeremfaso-Mampong, project site to fix pipes for electric wiring and plastering pipes.
the mason also started work with plastering on electric house.

https://drive.google.com/open?id=0BwUPsWGsMLpBQVlsb1pWWjhfODA

https://drive.google.com/open?id=0BwUPsWGsMLpBQnZmVWN4MEtHU2M

https://drive.google.com/open?id=0BwUPsWGsMLpBZ1c5ZUtaWXJYdkk

Friday oct 2, 2015

Went to Mampong and together with Gloria to the electricity company to submit the letter, land marking to the manager's office.
Gloria signed as the caretaker for her name to be on the bill for payment and I witnessed it...the estimator was scheduled to examine the site on Tuesday Aug 6, 2015.
I came back to kyeremfaso to monitor work progress and continued with fixing boxes for electric house.
electric house roofing was completed on Friday Aug 2,2015.

https://drive.google.com/open?id=0BwUPsWGsMLpBS0lnMTlfRG40cGM

https://drive.google.com/open?id=0BwUPsWGsMLpBZlVrNHBoOUJZXzg

arrival at kyeremfaso at 9:30am
departure: 6:00pm

180124..it_gh Mampong

Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...