Today .....
I went to purchase materials for Okubi water automation system.....
Sulley and David started with the fountain works ...
The old pump system was troubleshooted and was bent ....so a new pump was fixed and tested running....
And also the cable for the automation water system was drawn....
I went to purchase materials for Okubi water automation system.....
Sulley and David started with the fountain works ...
The old pump system was troubleshooted and was bent ....so a new pump was fixed and tested running....
And also the cable for the automation water system was drawn....
Work to be continued on 161004......