Wednesday, November 30, 2016

it_GH presentation update

the presentation map for job acquisition was updated and modified......
it_GH examining it to proceed work with it

Wednesday, November 23, 2016

161112_estimate draft

the pump system for okubi prepared and sent to Emmanuel.(Okubi Hotel)

https://drive.google.com/open?id=1n2I9fcNzAwAZ7AZndIrZzMkmSBdVdSyHrNkZ988oVdI

Saturday, November 12, 2016

161112_okubi contract

Okubi requested it-GH to fix a problem with their pumping system sending water to the hotel rooms.
we checked the system and decided to change the pumping system for them

Friday, November 11, 2016

180124..it_gh Mampong

Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...