Wednesday, September 28, 2016

150929_dig channel for bell & light in fetching station

Digging pipe channel to fetching station for the bell and bell switch was done .....
together with Sulley and David....and as well saw work go on with the waste tank.......

Monday, September 26, 2016

160916_Okubi drawing update

I updated the drawing for Okubi hotel water automation system .........
i added a legend to the drawing to make it more understanding to read ........



survey and drawing

1/ today we went to okubi to do actual measurement of length and height to fit in the estimate ....
2. the drawing for the automation system is also prepared.....

location surveying and fountain diagnosis was done by I- Emmanuel. Sulley and David.





Estimate update-gh-it_10916_Okubi

I updated the estimate done for okubi hotel

https://drive.google.com/open?id=0BwUPsWGsMLpBc1lMcF9jVHdRWkE

Tuesday, September 20, 2016

Estimate for gh-it 160916-Okubi

1/ estimate for the water automation system at okubi hotel done .......
yet to be given to the management for acceptance.\\\\\



https://drive.google.com/open?id=0BwUPsWGsMLpBUEphTllPTlB4cU0

Friday, September 16, 2016

okubi contract aquisition

the preposition of the construction of water automation system and fountain repair for okubi hotel
4 polytsnk on rooftop
location- Abrepo Ashanti


fountain
polytank

Friday, September 9, 2016

150929b_nkwantakese_bell and lamp channel dig

Digging pipe channel to fetching station for the bell and bell switch was done .....
together with Sulley and David....and as well saw work go on with the waste tank.......

180124..it_gh Mampong

Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...