Wednesday, December 21, 2016

Wednesday, November 30, 2016

it_GH presentation update

the presentation map for job acquisition was updated and modified......
it_GH examining it to proceed work with it

Wednesday, November 23, 2016

161112_estimate draft

the pump system for okubi prepared and sent to Emmanuel.(Okubi Hotel)

https://drive.google.com/open?id=1n2I9fcNzAwAZ7AZndIrZzMkmSBdVdSyHrNkZ988oVdI

Saturday, November 12, 2016

161112_okubi contract

Okubi requested it-GH to fix a problem with their pumping system sending water to the hotel rooms.
we checked the system and decided to change the pumping system for them

Friday, November 11, 2016

Monday, October 31, 2016

150929b_stores MCB fixing

Fixing continues ....store one ...distribution(MCB) board was fixed....
Also outside fixing with ceiling rose was done...

Tuesday, October 25, 2016

150929b_accessories fixing

Work started today with fixing of Electrical accessories... That's the light and socket switches...

Saturday, October 22, 2016

150929_ accessories purchase

Electrical accessories ; sockets, lamp holders and everything needed for 150929b project purchased to site.

Wednesday, October 19, 2016

150929b_installation test with sensor lamp

Wiring installation still ongoing....
The hall and kitchen has been done with...The trunking part were covered....
The sensor led lamp was temporarily fixed....
and system half way tested....

Tuesday, October 18, 2016

Friday, October 14, 2016

Thursday, October 13, 2016

begin work for trunking

After window painting...
The trunking works for the electrical wiring ..
Began...
Trunking work still in progress...

Saturday, October 8, 2016

solar panel fixing and testing

Today ....
Solar panels installation work is done ....and tested....with lamp and pump....
Actual wiring ...continues on Monday(161009)

panel fixing

Today ....
Solar panels installation work is done ....and tested....with lamp and pump....
Actual wiring ...continues on Monday(161009)

Friday, October 7, 2016

automation and fountain completed_160916

Today.....the 5th day ....
16th of Oct. 2016
Work after all is done and completed....
The automation and fountain work ....

Wednesday, October 5, 2016

automation installation

Work for the high level tanks(4 polytanks) ,that is the automatic switch control was done successfully left with low level(2 polytanks)...

fountain works

Today fountain work was critically diagnosed and improvised a way to solve for all to work....
* The frog design of the fountain was chiseled out and found that the pumps were broken...
* All cables feeding the fountain were broken and couldn't work...
* A new piping system is now being designed to make found operate again...

Monday, October 3, 2016

material purchase

Today .....
I went to purchase materials for Okubi water automation system.....
Sulley and David started with the fountain works ...
The old pump system was troubleshooted and was bent ....so a new pump was fixed and tested running....
And also the cable for the automation water system was drawn....
Work to be continued on 161004......

Wednesday, September 28, 2016

150929_dig channel for bell & light in fetching station

Digging pipe channel to fetching station for the bell and bell switch was done .....
together with Sulley and David....and as well saw work go on with the waste tank.......

Monday, September 26, 2016

160916_Okubi drawing update

I updated the drawing for Okubi hotel water automation system .........
i added a legend to the drawing to make it more understanding to read ........



survey and drawing

1/ today we went to okubi to do actual measurement of length and height to fit in the estimate ....
2. the drawing for the automation system is also prepared.....

location surveying and fountain diagnosis was done by I- Emmanuel. Sulley and David.





Estimate update-gh-it_10916_Okubi

I updated the estimate done for okubi hotel

https://drive.google.com/open?id=0BwUPsWGsMLpBc1lMcF9jVHdRWkE

Tuesday, September 20, 2016

Estimate for gh-it 160916-Okubi

1/ estimate for the water automation system at okubi hotel done .......
yet to be given to the management for acceptance.\\\\\



https://drive.google.com/open?id=0BwUPsWGsMLpBUEphTllPTlB4cU0

Friday, September 16, 2016

okubi contract aquisition

the preposition of the construction of water automation system and fountain repair for okubi hotel
4 polytsnk on rooftop
location- Abrepo Ashanti


fountain
polytank

Friday, September 9, 2016

150929b_nkwantakese_bell and lamp channel dig

Digging pipe channel to fetching station for the bell and bell switch was done .....
together with Sulley and David....and as well saw work go on with the waste tank.......

Wednesday, August 17, 2016

fetching notice and fault trace.(*Aug.16.16

Agenda:
fetching notice and fault trace

Time: 12pm
hours used - 1hr
Task :
        I went to paste a A4 sized notice beside the fetching wall indicating time of fetching water and traced a fault identified last time of visit.
Fault detected and diagnosed.

Thursday, May 5, 2016

completed work 150330

Date :
5.05.16
Time:
11 am
Task:
1. Automation system for pump complete
2. Plaque fixing
3. Fetching station gutter for water direction passage...
 Job by:
Emmanuel ,Sulley and plasterer....
* all three task done with automation working correctly...
Finished at 6pm....




Thursday, March 17, 2016

automation works

automation system for fetching station complete...
 to test the pump and everything worked correctly when tested

Thursday, March 10, 2016

Wednesday, March 9, 2016

plumbing works- 160309

plumbing works started for mampong-north fetching station and finished today .....
left with little touch-up to complete project......

Friday, March 4, 2016

tools fixing at office...

David n I fixed tools hanger at office at Kronum ....with Stephen sorting store items on unicentas .....then we tried fixing issues with the desktop computers for training.....


Saturday, February 20, 2016

Meeting with PP

I met with PP together with Mustapha ....
PP and I scheduled to meet in Mampong on Tuesday to see work progress on water project at Kyeremfaso.....

180124..it_gh Mampong

Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...