Wednesday, September 30, 2015

30.sept.2015

Work for electric house has got to roofing stage...
Electric work has also began ...with chiselling n conduit boxes fixed for  lighting, socket n motor ...

https://drive.google.com/folder/d/0BwUPsWGsMLpBfnFYZUdMc3ZBazJYa3plcDJZRlY3SE1mdkplOEJJMFc2eF8tcHBkamxMb3M/edit

Thursday, September 24, 2015

Sept.24,2015

Work progress from Mampong...
Plastering work for electric house still in progress ...yet in lintel stage....

https://drive.google.com/thumbnail?id=0BwUPsWGsMLpBaGZoVGVDQi1FdEk&authuser=0&v=1443140906539&sz=w348-h260-p-k-nu

Sunday, September 13, 2015

overview of hydraulic drawing for drilling, sept.10, 2015

overview of hydraulic drawing was done....partway
to be completed later....


time spent: 1hr




https://drive.google.com/open?id=0BwUPsWGsMLpBQmQ1U2QwM3dFbTA

land survey report collection, sept.7, 2015

*collection of geophysical land study on drill site report
collection date ;sept.7,   1:30pm
collection made by Emmanuel Panford
received from : kwabena Agyenim


*payment of ghc1300 was made......
 recipient: kwabena Agyenim


*expenses: transportion
ghc 10

geophysical study , sept.6, 2015

geophysical study was done on sunday by geologist......

meet up with geologist, 4th sept. 2015

meeting with geologist
things discussed:
*negotiation about geophysical study of probable location for drilling
cost reduces from ghc1500 to 1300.
location :Ghana water company ltd.


*proceeded to go with a geologist representative to show the site location of mampong water station.
*expenses by; geologist....

180124..it_gh Mampong

Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...