Tuesday, July 25, 2017

It-gh 170725 Nkwantakese

Work progress still ongoing .....
Now with block laying,
And carpentry works done for waste ....and pillar works done as well...

Friday, July 21, 2017

It-gh 170721 Nkwantakese

Work still ongoing now with concreting floor...
Fixing waste pipes and iron for waste

Wednesday, July 19, 2017

It-gh 170719 Okubi leak

After Nkwantakese....I went to continue Okubi 's water leak and fountain pump...fault as well as fixing new covers for the fuse and a burnt socket outlet  ....
Now everything is fixed and done....

It-gh 170719 Nkwantakese

I did went to check up on the new site .....about how work goes now....

Sunday, July 16, 2017

It-gh 170711/12 mampong

Fixing of solar panels ....and installing a new pump was installed...and everything worked correctly and in operation. ...

It-gh 170715 Okubi

Okubi work continues...
The fault revealed after chiselling some an area ...showed the chiselling is to be done inside the room...so the room is be emptied and work continues. ...
Other room with leakage were found n solved..
AC condenser pipes ouside was passed through and directed through one pipe out....
The pump now for the fountain isn't working...I check as son possible...

It-gh 170706 fencing

Fencing started at Nkwankese....

It-gh 170705 at melcom

We went to melcom to purchase some systems and as well the market for mesh for fencing in Nkwantakese. ...

It-gh 170704 Okubi leak

Okubi reported of a leak of water in their building and I diagnosed them.estimate was done and work starts to fix the problem....
Some of which are solved and some ....needs some of the room to be emptied before proceeding....

Tuesday, July 4, 2017

It-gh 170703

Time : 11:00am
Schedule - Meeting with infratec-gh ....

# Today we had a meeting with P.P to look at the way forward for the project and what to do next .....with the registration as well for infratec-gh. ...

It-gh 170623

Place: Nkwantakese
Time: 08:00am

* borehole hole drilling date .....
All infratec-gh reps were around and PP as well.....

180124..it_gh Mampong

Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...