Thursday, November 26, 2015

Cable laying...26.11.15

Infra tec .........engineers digged hole path for PVC pipe and cable laying for motor control and float switching....
Still waiting for inverter to test pump with solar electricity...
https://drive.google.com/folder/d/0BwUPsWGsMLpBaTZnN1BubE9QTUk/edit

Solar work installs contd 23.11.15

Solar installation work done ....
After installation.... Testing the inverter output voltage gave 500v which is detected the inverter was faulty....
Inverter is sent to distributor for rectification......
https://drive.google.com/folder/d/0BwUPsWGsMLpBaTZnN1BubE9QTUk/edit

Sunday, November 22, 2015

infra-tec-gh solar installation... 21.11.15

Solar installation work started....
Time start .10:30am
End .6:00pm ...

Work did:
drilling holes for fixing panels,panel fixing,fixed solar panel charge controller,inverter and batteries.
........work continues ...on Monday .23.11.15
What is to be done lighting, passing cables & testing pump...
https://drive.google.com/folder/d/0BwUPsWGsMLpBaTZnN1BubE9QTUk/edit

Monday, November 16, 2015

El equipment...,16nov.2015

Infra-tec-gh...went to purchase electrical equipment n cables for El
https://drive.google.com/file/d/0BwUPsWGsMLpBNzFHVFY4bi1nUGM/view?usp=docslist_api

Tuesday, November 10, 2015

Nov.10.15

Project work to be continued in due time  in Mampong ....
Solar work construction equipment has been ordered ....waiting to arrive...

180124..it_gh Mampong

Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...