Today ....
Solar panels installation work is done ....and tested....with lamp and pump....
Actual wiring ...continues on Monday(161009)
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Saturday, October 8, 2016
Subscribe to:
Post Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste
-
Fault tracing at Okubi... Borehole pump not working.... Checked power.... Pump need to be removed n checked as well...