1/ today we went to okubi to do actual measurement of length and height to fit in the estimate ....
2. the drawing for the automation system is also prepared.....
location surveying and fountain diagnosis was done by I- Emmanuel. Sulley and David.
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Subscribe to:
Post Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste
-
Day of travel Departure 11:05pm Arrival 5:45am( 7:45pm Amsterdam-Europe time)
-
Work progress still ongoing ..... Now with block laying, And carpentry works done for waste ....and pillar works done as well... ...