overview of it_GH nkwantakese sub project - solar installation as well.
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Wednesday, December 21, 2016
Wednesday, November 30, 2016
it_GH presentation update
the presentation map for job acquisition was updated and modified......
it_GH examining it to proceed work with it
Wednesday, November 23, 2016
161112_estimate draft
the pump system for okubi prepared and sent to Emmanuel.(Okubi Hotel)
https://drive.google.com/open?id=1n2I9fcNzAwAZ7AZndIrZzMkmSBdVdSyHrNkZ988oVdI
https://drive.google.com/open?id=1n2I9fcNzAwAZ7AZndIrZzMkmSBdVdSyHrNkZ988oVdI
Saturday, November 12, 2016
161112_okubi contract
Okubi requested it-GH to fix a problem with their pumping system sending water to the hotel rooms.
we checked the system and decided to change the pumping system for them
we checked the system and decided to change the pumping system for them
Friday, November 11, 2016
Monday, October 31, 2016
150929b_stores MCB fixing
Fixing continues ....store one ...distribution(MCB) board was fixed....
Also outside fixing with ceiling rose was done...
Also outside fixing with ceiling rose was done...
Thursday, October 27, 2016
Tuesday, October 25, 2016
Saturday, October 22, 2016
150929_ accessories purchase
Electrical accessories ; sockets, lamp holders and everything needed for 150929b project purchased to site.
Wednesday, October 19, 2016
150929b_installation test with sensor lamp
Wiring installation still ongoing....
The hall and kitchen has been done with...The trunking part were covered....
The sensor led lamp was temporarily fixed....
and system half way tested....
The hall and kitchen has been done with...The trunking part were covered....
The sensor led lamp was temporarily fixed....
and system half way tested....
Tuesday, October 18, 2016
150929b_trunking and installation
Trunking works and electrical wiring installation still continues....
Friday, October 14, 2016
Thursday, October 13, 2016
begin work for trunking
After window painting...
The trunking works for the electrical wiring ..
Began...
Trunking work still in progress...
The trunking works for the electrical wiring ..
Began...
Trunking work still in progress...
Saturday, October 8, 2016
solar panel fixing and testing
Today ....
Solar panels installation work is done ....and tested....with lamp and pump....
Actual wiring ...continues on Monday(161009)
Solar panels installation work is done ....and tested....with lamp and pump....
Actual wiring ...continues on Monday(161009)
panel fixing
Today ....
Solar panels installation work is done ....and tested....with lamp and pump....
Actual wiring ...continues on Monday(161009)
Solar panels installation work is done ....and tested....with lamp and pump....
Actual wiring ...continues on Monday(161009)
Friday, October 7, 2016
automation and fountain completed_160916
Today.....the 5th day ....
16th of Oct. 2016
Work after all is done and completed....
The automation and fountain work ....
16th of Oct. 2016
Work after all is done and completed....
The automation and fountain work ....
Wednesday, October 5, 2016
automation installation
Work for the high level tanks(4 polytanks) ,that is the automatic switch control was done successfully left with low level(2 polytanks)...
fountain works
Today fountain work was critically diagnosed and improvised a way to solve for all to work....
* The frog design of the fountain was chiseled out and found that the pumps were broken...
* All cables feeding the fountain were broken and couldn't work...
* A new piping system is now being designed to make found operate again...
* The frog design of the fountain was chiseled out and found that the pumps were broken...
* All cables feeding the fountain were broken and couldn't work...
* A new piping system is now being designed to make found operate again...
Monday, October 3, 2016
material purchase
Today .....
I went to purchase materials for Okubi water automation system.....
Sulley and David started with the fountain works ...
The old pump system was troubleshooted and was bent ....so a new pump was fixed and tested running....
And also the cable for the automation water system was drawn....
I went to purchase materials for Okubi water automation system.....
Sulley and David started with the fountain works ...
The old pump system was troubleshooted and was bent ....so a new pump was fixed and tested running....
And also the cable for the automation water system was drawn....
Work to be continued on 161004......
Thursday, September 29, 2016
Wednesday, September 28, 2016
150929_dig channel for bell & light in fetching station
Digging pipe channel to fetching station for the bell and bell switch was done .....
together with Sulley and David....and as well saw work go on with the waste tank.......
together with Sulley and David....and as well saw work go on with the waste tank.......
Monday, September 26, 2016
160916_Okubi drawing update
I updated the drawing for Okubi hotel water automation system .........
i added a legend to the drawing to make it more understanding to read ........
i added a legend to the drawing to make it more understanding to read ........
survey and drawing
1/ today we went to okubi to do actual measurement of length and height to fit in the estimate ....
2. the drawing for the automation system is also prepared.....
location surveying and fountain diagnosis was done by I- Emmanuel. Sulley and David.
2. the drawing for the automation system is also prepared.....
location surveying and fountain diagnosis was done by I- Emmanuel. Sulley and David.
Estimate update-gh-it_10916_Okubi
I updated the estimate done for okubi hotel
https://drive.google.com/open?id=0BwUPsWGsMLpBc1lMcF9jVHdRWkE
https://drive.google.com/open?id=0BwUPsWGsMLpBc1lMcF9jVHdRWkE
Tuesday, September 20, 2016
Estimate for gh-it 160916-Okubi
1/ estimate for the water automation system at okubi hotel done .......
yet to be given to the management for acceptance.\\\\\
https://drive.google.com/open?id=0BwUPsWGsMLpBUEphTllPTlB4cU0
yet to be given to the management for acceptance.\\\\\
https://drive.google.com/open?id=0BwUPsWGsMLpBUEphTllPTlB4cU0
Friday, September 16, 2016
okubi contract aquisition
Friday, September 9, 2016
150929b_nkwantakese_bell and lamp channel dig
Digging pipe channel to fetching station for the bell and bell switch was done .....
together with Sulley and David....and as well saw work go on with the waste tank.......
together with Sulley and David....and as well saw work go on with the waste tank.......
Wednesday, August 17, 2016
fetching notice and fault trace.(*Aug.16.16
Agenda:
fetching notice and fault trace
Time: 12pm
hours used - 1hr
Task :
I went to paste a A4 sized notice beside the fetching wall indicating time of fetching water and traced a fault identified last time of visit.
Fault detected and diagnosed.
fetching notice and fault trace
Time: 12pm
hours used - 1hr
Task :
I went to paste a A4 sized notice beside the fetching wall indicating time of fetching water and traced a fault identified last time of visit.
Fault detected and diagnosed.
Thursday, May 5, 2016
completed work 150330
Date :
5.05.16
Time:
11 am
Task:
1. Automation system for pump complete
2. Plaque fixing
3. Fetching station gutter for water direction passage...
Job by:
Emmanuel ,Sulley and plasterer....
* all three task done with automation working correctly...
Finished at 6pm....
5.05.16
Time:
11 am
Task:
1. Automation system for pump complete
2. Plaque fixing
3. Fetching station gutter for water direction passage...
Job by:
Emmanuel ,Sulley and plasterer....
* all three task done with automation working correctly...
Finished at 6pm....
Thursday, March 17, 2016
automation works
automation system for fetching station complete...
to test the pump and everything worked correctly when tested
to test the pump and everything worked correctly when tested
Thursday, March 10, 2016
Wednesday, March 9, 2016
plumbing works- 160309
plumbing works started for mampong-north fetching station and finished today .....
left with little touch-up to complete project......
left with little touch-up to complete project......
Friday, March 4, 2016
tools fixing at office...
David n I fixed tools hanger at office at Kronum ....with Stephen sorting store items on unicentas .....then we tried fixing issues with the desktop computers for training.....
Saturday, February 20, 2016
Meeting with PP
I met with PP together with Mustapha ....
PP and I scheduled to meet in Mampong on Tuesday to see work progress on water project at Kyeremfaso.....
PP and I scheduled to meet in Mampong on Tuesday to see work progress on water project at Kyeremfaso.....
Subscribe to:
Posts (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Time - 12:00pm - 8:30pm Venue - Arisdorf & Solothurn(Witterswil) 😇 Today after breakfast, we went together with Auntie Ruth to h...
-
Time: 8:45am - 18:45pm Baselstrasse Aesch BL - Haeusler âž½ After breakfast today, we visited the kids of the school where auntie Ruth...
-
time: 11:30am - 18:00pm Place: Basel city ↺ Today the guys were in Basel city, the region of the town we stay in, Arisdorf........we...