Ordered solar panels n equipment arrived ...
Time arrived 4:30pm
https://drive.google.com/file/d/0BwUPsWGsMLpBcU02UXNjNDAtX28/view?usp=docslist_api
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Wednesday, November 11, 2015
Subscribe to:
Post Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Fault tracing at Okubi... Borehole pump not working.... Checked power.... Pump need to be removed n checked as well...
-
Infra-tec had a meeting to decide on how and when to approach the hotels with our proposals
-
Work progress still ongoing ..... Now with block laying, And carpentry works done for waste ....and pillar works done as well... ...