Infra tec .........engineers digged hole path for PVC pipe and cable laying for motor control and float switching....
Still waiting for inverter to test pump with solar electricity...
https://drive.google.com/folder/d/0BwUPsWGsMLpBaTZnN1BubE9QTUk/edit
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Subscribe to:
Post Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Day of travel Departure 11:05pm Arrival 5:45am( 7:45pm Amsterdam-Europe time)
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste
-
Fault tracing at Okubi... Borehole pump not working.... Checked power.... Pump need to be removed n checked as well...