Infra tec .........engineers digged hole path for PVC pipe and cable laying for motor control and float switching....
Still waiting for inverter to test pump with solar electricity...
https://drive.google.com/folder/d/0BwUPsWGsMLpBaTZnN1BubE9QTUk/edit
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Thursday, November 26, 2015
Solar work installs contd 23.11.15
Solar installation work done ....
After installation.... Testing the inverter output voltage gave 500v which is detected the inverter was faulty....
Inverter is sent to distributor for rectification......
https://drive.google.com/folder/d/0BwUPsWGsMLpBaTZnN1BubE9QTUk/edit
After installation.... Testing the inverter output voltage gave 500v which is detected the inverter was faulty....
Inverter is sent to distributor for rectification......
https://drive.google.com/folder/d/0BwUPsWGsMLpBaTZnN1BubE9QTUk/edit
Sunday, November 22, 2015
infra-tec-gh solar installation... 21.11.15
Solar installation work started....
Time start .10:30am
End .6:00pm ...
Work did:
drilling holes for fixing panels,panel fixing,fixed solar panel charge controller,inverter and batteries.
........work continues ...on Monday .23.11.15
What is to be done lighting, passing cables & testing pump...
https://drive.google.com/folder/d/0BwUPsWGsMLpBaTZnN1BubE9QTUk/edit
Time start .10:30am
End .6:00pm ...
Work did:
drilling holes for fixing panels,panel fixing,fixed solar panel charge controller,inverter and batteries.
........work continues ...on Monday .23.11.15
What is to be done lighting, passing cables & testing pump...
https://drive.google.com/folder/d/0BwUPsWGsMLpBaTZnN1BubE9QTUk/edit
Monday, November 16, 2015
El equipment...,16nov.2015
Infra-tec-gh...went to purchase electrical equipment n cables for El
https://drive.google.com/file/d/0BwUPsWGsMLpBNzFHVFY4bi1nUGM/view?usp=docslist_api
https://drive.google.com/file/d/0BwUPsWGsMLpBNzFHVFY4bi1nUGM/view?usp=docslist_api
Wednesday, November 11, 2015
Ordered solar panels n equipment arrived ...
Time arrived 4:30pm
https://drive.google.com/file/d/0BwUPsWGsMLpBcU02UXNjNDAtX28/view?usp=docslist_api
Time arrived 4:30pm
https://drive.google.com/file/d/0BwUPsWGsMLpBcU02UXNjNDAtX28/view?usp=docslist_api
Tuesday, November 10, 2015
Nov.10.15
Project work to be continued in due time in Mampong ....
Solar work construction equipment has been ordered ....waiting to arrive...
Solar work construction equipment has been ordered ....waiting to arrive...
Subscribe to:
Posts (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Time - 12:00pm - 8:30pm Venue - Arisdorf & Solothurn(Witterswil) 😇 Today after breakfast, we went together with Auntie Ruth to h...
-
Time: 8:45am - 18:45pm Baselstrasse Aesch BL - Haeusler âž½ After breakfast today, we visited the kids of the school where auntie Ruth...
-
time: 11:30am - 18:00pm Place: Basel city ↺ Today the guys were in Basel city, the region of the town we stay in, Arisdorf........we...