I went back to the site and the estimator for the electric house from electricity company came on Tuesday for site inspection...but he requested for the site plan for the land of the project in order to determine where the pole should be for connection of the electric energy meter. if that isn't provided then I have to provide that before he progresses to give estimate everything...
the estimator rescheduled for next week to provide the site-plan then he can proceed to estimate.
the mason continues with plastering........
Estimate for the waterstation and pillars for the polytank was also made...
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Subscribe to:
Post Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Day of travel Departure 11:05pm Arrival 5:45am( 7:45pm Amsterdam-Europe time)
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste
-
Fault tracing at Okubi... Borehole pump not working.... Checked power.... Pump need to be removed n checked as well...