with reference to the pool pump and the water not flowing in the last floor at Okubi Hotel .......
I went to check the pool pump and came up with a solution to turn all the water valves on to keep the pressure of water high so as to clean well the water and asked the pool operator to monitor and get me report on it.
the pump to keep water at high pressure at the last floor is faulty and needs to be replaced..
I do estimate for the hotel manager to know the next step to go about it.
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Subscribe to:
Post Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Day of travel Departure 11:05pm Arrival 5:45am( 7:45pm Amsterdam-Europe time)
-
Work progress still ongoing ..... Now with block laying, And carpentry works done for waste ....and pillar works done as well... ...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste