the manager set a reschedule meeting on the 20th of February,2017
the meeting was successful and we submitted to him estimate for the automation water system.
he proposed that another estimate be done to determine the equipment and gadget which will be used on solar system to help reduce their electricity cost.....
we took data of the equipment used at the hotel to help us investigate.............
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Subscribe to:
Post Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Day of travel Departure 11:05pm Arrival 5:45am( 7:45pm Amsterdam-Europe time)
-
Work progress still ongoing ..... Now with block laying, And carpentry works done for waste ....and pillar works done as well... ...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste