Today ....things were cleared and space prepared for the training school stuff...
Hope for the future....we prepared ...five(5) PCs. ...one as master pc and the four remaining as students pcs......
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Tuesday, September 12, 2017
It_gh 170912 at office
Friday, September 8, 2017
It_gh 170906
Started with installations on pc....
3 pcs were done ....but autoCAD wasn't able to install....yet to find out y....
Tuesday, September 5, 2017
It_gh 170904 .....at Nkwantakese
On the Nkwantakese project......Stephen and I went to fix the meter board and passed cable so electricity could be connected to the site....
Subscribe to:
Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste
-
Fault tracing at Okubi... Borehole pump not working.... Checked power.... Pump need to be removed n checked as well...