P.P went with infra-tec-gh to inspect work done on solar construction and the testing of pump....
work still progresses with fencing for solar panels, fetching station, and pillars for water storage tanks...
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Wednesday, December 9, 2015
27.11.15,solar work done and testing
on the 27 Dec. 15, infra-tec-gh, reps Emmanuel Panford & Sulley Mustapha Ahmed got solar work done and tested the pump for water flow and intact water got flowing......
https://drive.google.com/folder/d/0BwUPsWGsMLpBaTZnN1BubE9QTUk/edit
https://drive.google.com/folder/d/0BwUPsWGsMLpBaTZnN1BubE9QTUk/edit
30.11.15,nfratec-gh with pp to Nkwantakese
on this day Monday 30th December, 2015
infra-tec-gh colleges went together to nkwantakese to visit projects :
it150929
it150928
infra-tec-gh colleges went together to nkwantakese to visit projects :
it150929
it150928
Subscribe to:
Posts (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Day of travel Departure 11:05pm Arrival 5:45am( 7:45pm Amsterdam-Europe time)
-
Work progress still ongoing ..... Now with block laying, And carpentry works done for waste ....and pillar works done as well... ...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste