Agenda:
fetching notice and fault trace
Time: 12pm
hours used - 1hr
Task :
I went to paste a A4 sized notice beside the fetching wall indicating time of fetching water and traced a fault identified last time of visit.
Fault detected and diagnosed.
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Wednesday, August 17, 2016
Thursday, May 5, 2016
completed work 150330
Date :
5.05.16
Time:
11 am
Task:
1. Automation system for pump complete
2. Plaque fixing
3. Fetching station gutter for water direction passage...
Job by:
Emmanuel ,Sulley and plasterer....
* all three task done with automation working correctly...
Finished at 6pm....
5.05.16
Time:
11 am
Task:
1. Automation system for pump complete
2. Plaque fixing
3. Fetching station gutter for water direction passage...
Job by:
Emmanuel ,Sulley and plasterer....
* all three task done with automation working correctly...
Finished at 6pm....
Thursday, March 17, 2016
automation works
automation system for fetching station complete...
to test the pump and everything worked correctly when tested
to test the pump and everything worked correctly when tested
Thursday, March 10, 2016
Wednesday, March 9, 2016
plumbing works- 160309
plumbing works started for mampong-north fetching station and finished today .....
left with little touch-up to complete project......
left with little touch-up to complete project......
Friday, March 4, 2016
tools fixing at office...
David n I fixed tools hanger at office at Kronum ....with Stephen sorting store items on unicentas .....then we tried fixing issues with the desktop computers for training.....
Saturday, February 20, 2016
Meeting with PP
I met with PP together with Mustapha ....
PP and I scheduled to meet in Mampong on Tuesday to see work progress on water project at Kyeremfaso.....
PP and I scheduled to meet in Mampong on Tuesday to see work progress on water project at Kyeremfaso.....
Subscribe to:
Posts (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste
-
Today ....things were cleared and space prepared for the training school stuff... Hope for the future....we prepared ...five(5) PCs. ...one...