Agenda:
fetching notice and fault trace
Time: 12pm
hours used - 1hr
Task :
I went to paste a A4 sized notice beside the fetching wall indicating time of fetching water and traced a fault identified last time of visit.
Fault detected and diagnosed.
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Subscribe to:
Post Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Today ..... I went to purchase materials for Okubi water automation system..... Sulley and David started with the fountain works ... The ol...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste
-
Infra tec .........engineers digged hole path for PVC pipe and cable laying for motor control and float switching.... Still waiting for inv...
No comments:
Post a Comment