Okubi work continues...
The fault revealed after chiselling some an area ...showed the chiselling is to be done inside the room...so the room is be emptied and work continues. ...
Other room with leakage were found n solved..
AC condenser pipes ouside was passed through and directed through one pipe out....
The pump now for the fountain isn't working...I check as son possible...
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Sunday, July 16, 2017
It-gh 170715 Okubi
Subscribe to:
Post Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Today ..... I went to purchase materials for Okubi water automation system..... Sulley and David started with the fountain works ... The ol...
-
Infra tec .........engineers digged hole path for PVC pipe and cable laying for motor control and float switching.... Still waiting for inv...
-
on the 27 Dec. 15, infra-tec-gh, reps Emmanuel Panford & Sulley Mustapha Ahmed got solar work done and tested the pump for water flow an...
No comments: