Digging pipe channel to fetching station for the bell and bell switch was done .....
together with Sulley and David....and as well saw work go on with the waste tank.......
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Subscribe to:
Post Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Work progress still ongoing ..... Now with block laying, And carpentry works done for waste ....and pillar works done as well... ...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste