I went back to the site and the estimator for the electric house from electricity company came on Tuesday for site inspection...but he requested for the site plan for the land of the project in order to determine where the pole should be for connection of the electric energy meter. if that isn't provided then I have to provide that before he progresses to give estimate everything...
the estimator rescheduled for next week to provide the site-plan then he can proceed to estimate.
the mason continues with plastering........
Estimate for the waterstation and pillars for the polytank was also made...
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Subscribe to:
Post Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Today ..... I went to purchase materials for Okubi water automation system..... Sulley and David started with the fountain works ... The ol...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste
-
Infra tec .........engineers digged hole path for PVC pipe and cable laying for motor control and float switching.... Still waiting for inv...