meeting with geologist
things discussed:
*negotiation about geophysical study of probable location for drilling
cost reduces from ghc1500 to 1300.
location :Ghana water company ltd.
*proceeded to go with a geologist representative to show the site location of mampong water station.
*expenses by; geologist....
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Subscribe to:
Post Comments (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste
-
Started with installations on pc.... 3 pcs were done ....but autoCAD wasn't able to install....yet to find out y....