BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)

Wednesday, December 21, 2016

Wednesday, November 30, 2016

it_GH presentation update

the presentation map for job acquisition was updated and modified......
it_GH examining it to proceed work with it

Wednesday, November 23, 2016

161112_estimate draft

the pump system for okubi prepared and sent to Emmanuel.(Okubi Hotel)

https://drive.google.com/open?id=1n2I9fcNzAwAZ7AZndIrZzMkmSBdVdSyHrNkZ988oVdI

Saturday, November 12, 2016

161112_okubi contract

Okubi requested it-GH to fix a problem with their pumping system sending water to the hotel rooms.
we checked the system and decided to change the pumping system for them

Friday, November 11, 2016

Monday, October 31, 2016

150929b_stores MCB fixing

Fixing continues ....store one ...distribution(MCB) board was fixed....
Also outside fixing with ceiling rose was done...

180124..it_gh Mampong

Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...