BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)

Friday, March 24, 2017

It-gh 170323


From Okubi hotel Sulley and Emmanuel headed to the market to make for pump prices in the market so we can get estimate done for okubi hotel as soon as possible.


The prices of the materials and the pump was made ……
So I proceeded to make the estimate for okubi hotel.


Thursday, March 23, 2017

it-gh 170323


Okubi hotel fault tracing continues the day March 23, 2017
Sulley and I had to pull out the pump from underground to detect that the pump was faulty
After analysis and test with resistance, it was detected that the pump was burnt and needs to be replaced.

pump removed from 50m deep borehole

Monday, March 20, 2017

170320

Fault tracing at Okubi...
Borehole pump not working....
Checked power....
Pump need to be removed n checked as well...

Friday, March 10, 2017

170309

To traveling processing office.
Registered online and set appointment date... On 170314

170308

Travel to Accra to process traveling documents

Monday, February 27, 2017

170227

Stephen took me through few process of the VISA application filling and some requirement.
I also got to upload the hotel list for to the drive......<>

Saturday, February 25, 2017

It-GH_>170225

with reference to the pool pump and the water not flowing in the last floor at Okubi Hotel .......
I went to check the pool pump and came up with a solution to turn all the water valves on to keep the pressure of water high so as to clean well the water and asked the pool operator to monitor and get me report on it.
the pump to keep water at high pressure at the last floor is faulty and needs to be replaced..
I do estimate for the hotel manager to know the next step to go about it.

180124..it_gh Mampong

Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...