the manager set a reschedule meeting on the 20th of February,2017
the meeting was successful and we submitted to him estimate for the automation water system.
he proposed that another estimate be done to determine the equipment and gadget which will be used on solar system to help reduce their electricity cost.....
we took data of the equipment used at the hotel to help us investigate.............
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Monday, February 20, 2017
Wednesday, February 15, 2017
it-GH 170209
Infra-tec had a meeting to decide on how and when to approach the hotels with our proposals
Tuesday, February 14, 2017
it-GH 170214
today, we set to another location, this time in santasi,tuc and danyame
rexmar hotel
feliama hotel
beg-egg hotel
hasta hotel
royal kobi lodge
marbon hotel
sunset hotel and
miklin hotel
rexmar hotel
feliama hotel
beg-egg hotel
hasta hotel
royal kobi lodge
marbon hotel
sunset hotel and
miklin hotel
Monday, February 13, 2017
it-GH 170213
the manager of Nurom and swaggart hotel asked for the system to be checked. everything was checked for their existing system and estimate was made for him as well.
Friday, February 10, 2017
it-GH 170210
the day on friday was set and some hotels were visited
pioneer hotel - afrancho
pokuaa hotel - afrancho
afabof hotel - afabof
new royalview hotel and - cement
nurom hotel * nurom hotel -suame
pioneer hotel - afrancho
pokuaa hotel - afrancho
afabof hotel - afabof
new royalview hotel and - cement
nurom hotel * nurom hotel -suame
Thursday, January 5, 2017
it-GH hotel enlistment in Ashanti region
i did an elisting of hotels in Ashanti region and so far i have 40 now hotels compiled
https://drive.google.com/open?id=0BwUPsWGsMLpBWFlDRGRrX0FRSm8
https://drive.google.com/open?id=0BwUPsWGsMLpBWFlDRGRrX0FRSm8
Wednesday, December 21, 2016
Subscribe to:
Posts (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste
-
Today ....things were cleared and space prepared for the training school stuff... Hope for the future....we prepared ...five(5) PCs. ...one...