the day on friday was set and some hotels were visited
pioneer hotel - afrancho
pokuaa hotel - afrancho
afabof hotel - afabof
new royalview hotel and - cement
nurom hotel * nurom hotel -suame
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Friday, February 10, 2017
Thursday, January 5, 2017
it-GH hotel enlistment in Ashanti region
i did an elisting of hotels in Ashanti region and so far i have 40 now hotels compiled
https://drive.google.com/open?id=0BwUPsWGsMLpBWFlDRGRrX0FRSm8
https://drive.google.com/open?id=0BwUPsWGsMLpBWFlDRGRrX0FRSm8
Wednesday, December 21, 2016
Wednesday, November 30, 2016
it_GH presentation update
the presentation map for job acquisition was updated and modified......
it_GH examining it to proceed work with it
Wednesday, November 23, 2016
161112_estimate draft
the pump system for okubi prepared and sent to Emmanuel.(Okubi Hotel)
https://drive.google.com/open?id=1n2I9fcNzAwAZ7AZndIrZzMkmSBdVdSyHrNkZ988oVdI
https://drive.google.com/open?id=1n2I9fcNzAwAZ7AZndIrZzMkmSBdVdSyHrNkZ988oVdI
Saturday, November 12, 2016
161112_okubi contract
Okubi requested it-GH to fix a problem with their pumping system sending water to the hotel rooms.
we checked the system and decided to change the pumping system for them
we checked the system and decided to change the pumping system for them
Friday, November 11, 2016
Subscribe to:
Posts (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste
-
Today ....things were cleared and space prepared for the training school stuff... Hope for the future....we prepared ...five(5) PCs. ...one...