it_GH examining it to proceed work with it
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
BLOG-Overview ... David in Switzerland http://gsep4david.blogspot.ch/ ... Emmanuel in Switzerland http://gsep2.blogspot.com (this BLOG)
Wednesday, November 30, 2016
Wednesday, November 23, 2016
161112_estimate draft
the pump system for okubi prepared and sent to Emmanuel.(Okubi Hotel)
https://drive.google.com/open?id=1n2I9fcNzAwAZ7AZndIrZzMkmSBdVdSyHrNkZ988oVdI
https://drive.google.com/open?id=1n2I9fcNzAwAZ7AZndIrZzMkmSBdVdSyHrNkZ988oVdI
Saturday, November 12, 2016
161112_okubi contract
Okubi requested it-GH to fix a problem with their pumping system sending water to the hotel rooms.
we checked the system and decided to change the pumping system for them
we checked the system and decided to change the pumping system for them
Friday, November 11, 2016
Subscribe to:
Posts (Atom)
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Day of travel Departure 11:05pm Arrival 5:45am( 7:45pm Amsterdam-Europe time)
-
Work progress still ongoing ..... Now with block laying, And carpentry works done for waste ....and pillar works done as well... ...
-
Work still ongoing now with concreting floor... Fixing waste pipes and iron for waste