Mampong sensor fix...
I went to fix Mampong sensor control switch for the automation system.. .
This was due to inaccuracy to sensor leveling...
Now is set well and working...
infra-tec-GH EMMANUEL Ghana Swiss in Switzerland
As a chance for Knowledge and culture exchange EMMANUEL and DAVID have a programme with Ruth in Switzerland from 20. April till 17. Mai 2017
Thursday, January 25, 2018
180124..it_gh Mampong
Tuesday, September 12, 2017
It_gh 170912 at office
Today ....things were cleared and space prepared for the training school stuff...
Hope for the future....we prepared ...five(5) PCs. ...one as master pc and the four remaining as students pcs......
Friday, September 8, 2017
It_gh 170906
Started with installations on pc....
3 pcs were done ....but autoCAD wasn't able to install....yet to find out y....
Tuesday, September 5, 2017
It_gh 170904 .....at Nkwantakese
On the Nkwantakese project......Stephen and I went to fix the meter board and passed cable so electricity could be connected to the site....
Tuesday, July 25, 2017
It-gh 170725 Nkwantakese
Work progress still ongoing .....
Now with block laying,
And carpentry works done for waste ....and pillar works done as well...
Friday, July 21, 2017
Wednesday, July 19, 2017
It-gh 170719 Okubi leak
After Nkwantakese....I went to continue Okubi 's water leak and fountain pump...fault as well as fixing new covers for the fuse and a burnt socket outlet ....
Now everything is fixed and done....
180124..it_gh Mampong
Mampong sensor fix... I went to fix Mampong sensor control switch for the automation system.. . This was due to inaccuracy to sensor level...
-
Time - 12:00pm - 8:30pm Venue - Arisdorf & Solothurn(Witterswil) 😇 Today after breakfast, we went together with Auntie Ruth to h...
-
Time: 8:45am - 18:45pm Baselstrasse Aesch BL - Haeusler âž½ After breakfast today, we visited the kids of the school where auntie Ruth...
-
time: 11:30am - 18:00pm Place: Basel city ↺ Today the guys were in Basel city, the region of the town we stay in, Arisdorf........we...